We assess ground-mounted solar investments in line with the site’s characteristics and the project’s technical requirements.
Planning considerations
- Site characteristics and usable area
- Solar exposure and shading conditions
- Grid connection and electrical infrastructure
- Layout, equipment, and implementation plan
The project approach is developed after the initial assessment, using the relevant site and grid connection data.
Where does a ground-mounted PV project begin?
Ground-mounted PV is an approach in which the solar power system is planned on a suitable site rather than a roof. The first step is to assess the investment objective together with the basic information about the land. During your initial discussion with Sakarya Erenler-based ISP Energy, you can share the details of your site and the current stage of your project.
Information required for an initial assessment
- The site’s location, approximate size, and available parcel information
- Current site photographs and information on gradient and access
- The purpose of the investment and any related electricity consumption data
- Existing electrical infrastructure and available grid connection information
- Any previous project studies and the target schedule
Missing data is identified during the initial discussion. Rights relating to the land, conditions of use, and applicable authority procedures must also be reviewed separately; site area alone does not confirm the project’s feasibility.
Factors affecting ground-mounted PV costs
The project budget varies according to the target system capacity, equipment selection, site preparation, mounting structure, electrical infrastructure, and grid connection scope. The scope must therefore be defined before a firm price can be provided; land area or megawatt capacity alone is not sufficient.
Generation forecasts and financial assessments must likewise be based on site data, system design, and investment assumptions. This page does not guarantee a fixed level of generation, revenue, or payback period.
From assessment to implementation
- Requirements and data assessment: Reviewing the investment objective and available site information.
- Review of technical options: Comparing layout, equipment, and electrical infrastructure options.
- Defining the scope: Establishing the work stages, division of responsibilities, and schedule.
Explore our solar PV EPC services for engineering, procurement, and implementation, or our solar PV consulting services to compare investment options. If you would instead like to assess an existing building, visit our rooftop PV installation page.
Let’s assess your ground-mounted project together
Use the ISP Energy contact details to start an initial discussion. Your site’s location and investment objective will provide the starting point.